EFFLUENT TREATMENT PLANT - TRÊS LAGOAS, MS - CENTROPROJEKT DO BRASIL S/A

CENTROPROJEKT DO BRASIL S/A

OBJECT: VCP Unit Wastewater Treatment Station Detailed Engineering Services;

LOCATION: Três Lagoas - MS.

Main Activities

  • Piping main route location survey, and piping plans and sections, piping special support drawings;
  • Single line diagrams (medium and high voltage); consolidated layout of substations and switchgear room; electric equipment installation plans and sections, power and control panels, including switchgear and control rooms; measurement calculation log of power cables (medium and high voltage); cable list;
  • Instrumentation installation distribution plans, including: communication networks, control cables, field equipment, junction boxes and SDCD interconnection optic fiber cable infrastructure; electrical interconnection diagrams; typical details;
  • Preparation of building plans, sections and details, building water and sanitation installation plan, section and details; Concrete structure, Metal structure, Soilwork; Road System/Paving, Drainage.

Cookie Use Policy

This website uses cookies to enhance your experience while you browse.
These cookies are categorized as necessary and are stored on your browser as they are essential for the functioning of the basic features of the site.