EFFLUENT TREATMENT PLANT - TRÊS LAGOAS, MS - CENTROPROJEKT DO BRASIL S/A
CENTROPROJEKT DO BRASIL S/A
OBJECT:
VCP Unit Wastewater Treatment Station Detailed Engineering Services;
LOCATION: Três Lagoas - MS.
Main Activities
- Piping main route location survey, and piping plans and sections, piping special support drawings;
- Single line diagrams (medium and high voltage); consolidated layout of substations and switchgear room; electric equipment installation plans and sections, power and control panels, including switchgear and control rooms; measurement calculation log of power cables (medium and high voltage); cable list;
- Instrumentation installation distribution plans, including: communication networks, control cables, field equipment, junction boxes and SDCD interconnection optic fiber cable infrastructure; electrical interconnection diagrams; typical details;
- Preparation of building plans, sections and details, building water and sanitation installation plan, section and details; Concrete structure, Metal structure, Soilwork; Road System/Paving, Drainage.